Before switching note tools, check how the whole library will keep working CCNeed compares plan terms and import documentation around the existing library, turning access rights, transfer routes and details requiring tests into a checklist. A change to a notes service’s free plan prompts users to consider alternatives. For someone with a large library, the questions are how existing content remains usable, how it can move and which structures will be preserved. Research material Original plan terms, user discussion, import documentation checked later, and representative notes or requirements from the team’s own workflow. Research question How would this library work in another tool? Which conditions are documented, and which must we test ourselves? The CCNeed research workflow Define the comparison around the team’s library Select plan terms, user discussion and import documentation, then explain which note structures the team relies on. Ask CCNeed to organise the questions around creating, consulting and moving content rather than listing generic features. A creation limit is not the loss of existing notes. The selected terms preserve access and export, which need to be described separately from limits on new content. Compare the documented transfer route Ask CCNeed to place export conditions beside the alternative’s import documentation, examining formats, content types and stated support. Retain the sequence of the material: terms at the plan change and documentation checked later. The documentation provides an ENEX route for notes, tags, attachments and metadata. That establishes something to try, not validation of the team’s entire library. Follow up on exceptions that affect daily use Open the report and linked analysis files, then ask separately about attachments, tags, complex formatting and internal links. Have CCNeed organise documented exceptions, unanswered details and the structures the team depends on. Complex formatting and some internal links have exceptions. A completed import and preservation of the working method require separate checks. Follow up: Based on the note structures we rely on most, list everything we should check after import. Create the comparison and a trial-import checklist Ask CCNeed to record conditions, exceptions and open checks for each dimension, with suggestions for choosing representative samples. The team can trial its own material and bring the findings back into the same research. Inspect notes with attachments, tags, complex layouts and internal links before expanding the trial. The existing material does not establish the team’s migration time or success rate. Specific findings in the material Separate limits on creating notes from access to existing content. The original service's announcement and plan-limit documentation preserve access to and export of existing notes. Adding new content, consulting an old library and moving that library are different tasks. A creation limit does not mean the existing material has been lost. The documentation provides a migration route to examine. The alternative note service supports importing notes, tags, attachments and metadata through ENEX. That establishes an export-and-import route to try; whether it meets the needs of a particular library still depends on checking that library's contents. Import support does not guarantee that every detail stays the same. The documentation lists exceptions for complex formatting and some internal links. If daily work relies on those structures, the migration assessment needs to check what survives. Completing an import and preserving the way the library is used are separate acceptance checks. Competitor comparison Keeping, moving and reusing a notes library Existing access: The source service permits access to and export of existing notes above the free creation limit. Transfer path: The alternative documents import of notes, tags, attachments and metadata from the export format. Fidelity: Complex formatting and some internal links have documented exceptions. The useful comparison has three parts: continued access, a transfer path and preservation of the information’s structure. The team uses the comparison to scope a trial, checks representative notes and records additional work before deciding whether to migrate more. CCNeed supports research and decision-making; the team carries out the transfer and acceptance checks. Public-record application example, not a customer project or business result.